Failure Analysis of Military Assembled-container Connector
Received:March 09, 2011  Revised:October 15, 2011
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:military assembled-container  connector  failure analysis  fatigue
                 
AuthorInstitution
LI Qin-zhen 1. Tianjin University, Tianjin , China; 2. Academy of Military Transportation, Tianjin , China
TIAN Run-liang Academy of Military Transportation, Tianjin , China
WANG Jin-song Academy of Military Transportation, Tianjin , China
MU Shan Engineering Design and Research Academy of GAD, Beijing , China
LI Jun-nian 1. No. 59 Institute of China Ordnance Industry, Chongqing , China;2. Chongqing Engineering Research Center for Environmental Corrosion and Protection, Chongqing , China
WANG Ling 1. No. 59 Institute of China Ordnance Industry, Chongqing , China;2. Chongqing Engineering Research Center for Environmental Corrosion and Protection, Chongqing , China
Hits:
Download times:
Abstract:
      The main failure forms of military assembled-container connector were introduced and their possible causes were analyzed. It was put forward that any lapsus in the process of design, manufacture, and use would result in connector failure. The causes of connector failure can be related to the factors of material, machining, structure, operating loads and application environment. Some typical instances coming from practical production were provided and some measurements to improve and control part qualities were suggested.
Close